Anchorage Water Wastewater Utility Sand Lake Sewer Phase II Pump Station 20 Upgrade

The project included by-passing existing wet well for major re-coating, new above ground generator, extensive cathodic protection anodes to extend life of existing below grade steel tanks. New transfer switch, pump starters and integration into existing SCADA PLC.

Share this Post:

Leave a Comment

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>
*
*